Saturday, March 28, 2009

Rebuilding Continues

It is looking a little more stable!




Iron beams were inserted into the wall to re-enforce the wall and upper level floor.












Here is the large doorway on the lower level. All of the bracing is still in place as the walls are being rebuilt.











The lower portion of the South wall is rebuilt. Two door ways were built into this level. One doorway is, small and the other one large enough to get the bobcat through.....more on that later.











Break time on a beautiful fall day!